MPLT in Vertical Wells

  • Run pump body on tubing with packer below the pump.
  • R/U CTU and pumping units.
  • Put on sealing inset to the CTU and connect tool.
  • RIH assembly on CTU and seat sealing inset to the pump body.
  • Start Pumping fluid to the tubing to make pump creating draw down and flow the well
  • Perform MPLT survey.

Need help?
Feel free contact us

Our mission is to empowers businesses off all size in an businesses.

Get consultant now!