- Run pump body on tubing with packer below the pump.
- R/U CTU and pumping units.
- Put on sealing inset to the CTU and connect tool.
- RIH assembly on CTU and seat sealing inset to the pump body.
- Start Pumping fluid to the tubing to make pump creating draw down and flow the well
- Perform MPLT survey.

Need help?
Feel free contact us
Our mission is to empowers businesses off all size in an businesses.